Multichain

Multichain cross-chain routing before shutdown

Multichain, formerly Anyswap, was a cross-chain protocol whose bridge and router services stopped during its 2023 crisis. It moved tokens between blockchains and supported cross-chain contract calls and NFT transfers. The team later told users to stop bridging after losing server access and reporting abnormal asset movements.

Last updated
In short: An anyToken balance could represent a pool claim when destination liquidity ran short, so it did not always mean delivery of the underlying token.

Asset delivery and contract calls served different needs

Before the shutdown, the choice of capability depended on whether the task involved delivering a token, moving an NFT or invoking a contract. Receiving an existing destination token involved different constraints from executing application logic on another chain. The Router addressed asset delivery, while anyCall supported cross-chain contract calls.

Historical option What it did Asset or data involved
Cross-chain Bridge Locked an origin asset and minted a pegged representation Tokens backed by assets on their origin chain
Router with native assets Delivered existing tokens through liquidity pools Tokens already issued on the receiving chain
Router with bridged assets Used bridge contracts with protocol-controlled minting Tokens the protocol could mint on that chain
anyCall Invoked contracts across chains Contract-call data in integrated applications
NFT bridge Extended bridging to non-fungible tokens NFTs in supported integrations

For tokens outside the protocol's minting control, destination liquidity governed delivery. Remote contract calls required compatible application integrations.

What determined the token received on another chain?

The asset's issuance model determined whether delivery relied on locked backing, destination liquidity or minting through bridge contracts. The Router could accommodate both existing and bridge-issued tokens, including combinations across different chains.

Locked backing

The Bridge model locked an asset on its origin chain while minting a pegged representation on the destination chain. The model matched minted tokens 1:1 with the backing held on the origin chain. Redemption burned the representation before releasing the corresponding backing. The destination token therefore depended on the assets held behind the bridge.

Visual summary: Multichain: Locked backing

View full-size image

Existing token liquidity

For tokens the protocol could not mint, the Router used pools containing existing tokens. In this terminology, native meant already issued on that chain; it did not mean only the chain's gas token. Sufficient destination liquidity allowed delivery of the underlying token. A shortage could leave the recipient holding an anyToken pool share. Converting that share into the underlying token required sufficient pool liquidity. Outgoing routes for the same asset or new liquidity deposits could replenish that pool. The shutdown added a loss of operating access to these liquidity constraints.

Protocol-minted and hybrid tokens

Where bridge contracts let the protocol mint the destination asset, delivery did not require a pool of pre-existing destination tokens. The minted destination tokens still required backing held on the asset's origin chain. Hybrid arrangements combined existing tokens on some chains with bridge-issued tokens elsewhere. Liquidity remained necessary on the existing-token side. The Router also let bridge-issued assets move between supported destination chains without first returning to their origin chain. This extended the older two-chain Bridge arrangement within the token routes and minting contracts the protocol supported.

The shared MPC dependency

MPC, or multi-party computation, supplied the shared signing framework behind the protocol's cross-chain functions before the shutdown. Its terminology also included SMPC, meaning secure multi-party computation. Its nodes coordinated asset movements and controlled the addresses holding bridge backing. Cloud account permissions governed who could maintain the servers running those nodes. The 2023 crisis exposed how restricted access to those accounts could obstruct maintenance.

Server access losses preceded the shutdown

Restricted maintenance access

The team's July 14, 2023 announcement described lost server access following CEO Zhaojun's detention on May 21. The team reported Chinese police had taken him into custody and that operators' access keys no longer worked. It also explained that the MPC servers ran under his personal cloud account. Other team members could not log into that account.

Some non-MPC servers remained accessible, allowing limited maintenance. On June 4, Zhaojun's family obtained cloud access through information on his home computer. Engineers received permission to address Router2 and Router5 problems through physical access to that computer. This restricted arrangement did not give the team general control of the cloud account.

Abnormal asset movements and cessation

The team reported abnormal transfers from MPC addresses on July 7. It later said Zhaojun's sister moved remaining router-pool assets on July 9 into addresses she controlled, describing this as preservation. That later movement was distinct from distributing funds back to affected users. The team did not identify who had initiated the earlier abnormal transfers.

On July 13, the family told the team that police had also detained Zhaojun's sister. The team then described losing contact with her and uncertainty over the assets. The team announced the cessation of operations on July 14, 2023. Lost access and unavailable operational funds prevented continued maintenance of the service.

Why could the website remain visible after the service stopped?

The team lacked access to the domain account, so it could not redirect or remove the frontend after ceasing operations. The interface's continued visibility therefore did not establish functioning cross-chain processing.

The July stop notice warned that bridge transactions would remain stuck on their source chains, with no confirmed resumption time. It asked users to stop using the bridging service. The team also urged users to revoke related contract approvals after the abnormal asset movements. Those warnings applied even if an interface remained reachable.

MULTI governance and suspended fee sharing

The project began as Anyswap in 2020, with ANY as its original token. MULTI later became its governance token, with a role separate from the assets moving through its bridges. The token design set a maximum supply of 100 million MULTI. Converting ANY to MULTI was a token migration, separate from cross-chain transfers of other assets.

The veMULTI model linked locked MULTI to NFTs carrying voting power and a share of protocol fee revenue. Fee sharing was suspended alongside bridge operations.

Earlier crediting promises depended on restored service

Earlier notices about partial route outages promised automatic crediting of pending transactions once service resumed. Some routes had continued operating during the earlier interruptions. The subsequent stop notice warned against using the bridging service across routes.

The team separately said a compensation plan would follow for users affected by those earlier outages. That promise expressed an intention; it did not report completed payments. For an unresolved transfer, the earlier crediting promise supplied neither a completion date nor confirmation that the owner had received the funds.

Multichain: frequently asked questions

Were rebase tokens suitable for the historical lock-and-mint bridge?

Rebase tokens were unsuitable for the documented lock-and-mint bridge model. The model matched minted destination tokens with assets held on the origin chain. An elastic supply could change balances without matching bridge activity, undermining that backing relationship. This limitation concerned that bridge design; it did not establish the capabilities of every other cross-chain mechanism.

On which network did the ANY-to-MULTI conversion rules apply?

The original rules specified Ethereum for converting ANY into MULTI. They described a one-way, 1:1 conversion and required ETH for gas, including contract approval. The rules introduced that arrangement on December 17, 2021 without a conversion deadline. Their historical terms did not establish the interface's availability after the project's later shutdown.

How did route settings determine bridge charges and transfer limits?

Historical charges and limits depended on the token and the selected source-to-destination route. Route configuration included fee rates, minimum and maximum fees, transfer-size limits and a large-transfer threshold. The API guide said transfers below the route minimum would not be processed and those above the large-transfer threshold would take longer. These settings did not supply one permanent charge or timing rule for the entire protocol. A displayed fee also did not establish that a suspended route could process transfers.

Could revoking a contract approval reverse an earlier transfer?

Revoking an ERC-20 approval changes future spending permission; it does not reverse a transfer the contract already completed. The team's July warning asked users to suspend services and revoke related approvals after abnormal asset movements. That measure concerned contracts' access to tokens remaining in wallets. It did not return assets already held at bridge addresses.

Which NFT standards did the historical NFT bridge support?

The historical NFT bridge supported ERC-721 and ERC-1155 contracts. Its anyCall-based template used gateway contracts to lock an NFT on the source chain and mint a corresponding NFT on the destination chain. Support for a standard did not establish support for every collection or continued operation of a particular route after the shutdown.

Could Router V7 combine a token transfer with a destination contract call?

Router V7 combined token routing and anyCall through the anySwapOutAndCall function. Its historical mainnet guide limited swap-and-call support to USDC and ETH amounts worth under $1,000. Applications needed a team-whitelisted anycallProxy receiver contract with an exec function. The documented flow included a source call, MPC relaying and destination execution. Receiver integration needed failure handling if destination execution failed. The later shutdown stopped bridge and router operations.

Does a MULTI exchange listing mean the bridge has reopened?

A MULTI listing concerns token trading and does not establish that the bridge has reopened. The team's July 2023 stop notice concerned cross-chain operations, not the availability of token trading at a separate venue.